| Indian River County Beach Restoration Sectors 1 & 2 |
|---|
| County | Indian River |
| Location | R-4 to T-17 |
| Designer / Monitor | ATM |
| Construction Date | Feb. - April 2003 |
| Length (miles) | 2.4 |
| Construction Beach Width (Avg. ft.) | 79 |
| Design Volume (cy) | 500,000 |
| Volume Placed (cy) | 589,350 |
| Volume Density (Avg. cy/ft) | 46.5 |
| Planned Nourishment Interval (years) | 6 |
| Construction Berm Width (Avg. ft.) | 85 |
| Construction Berm Elevation (Avg. ft.) | 9 |
| Borrow Source | 20 miles from the sectors 1 & 2 projector area |
| Mean Grain Size (mm) | Native Beach - 0.29, Borrow Area - 0.46 |
| Longshore Transport Rate (cy/year) | |
| Wave Direction (degree north) | 78.6 degrees from N |
| Wave Height (feet) | 4.2 |
| Wave Period (sec.) | 9.3 |