Juno Beach Main Page
 
Location Map
 
Design Parameters
 
Shoreline Change Plots
 
Volume Change Plots
 
Hot Spots
 
Performance Table
 
Performance Summary
 
 
Project Index

Juno Beach

 
*Changes from July-2000 Pre-Construction
Juno Beach Performance
Years of Post Construction Date of Survey Volume Above MHW
Remaining (%) Changes* (cy/ft)
Avg.MaxMin
07-2001 10039 4917
110-2002 8733 4625
2 7-2003 8934 4616
3 7-2004 7829 3915

 
Juno Beach Performance
Years of Post Construction Date of Survey Shoreline (MHW) Changes* (ft.)
Avg.Max.Min.
07-2001 119156 44
110-2002 9412265
2 7-2003 10713243
3 7-2004 9012429

 

© 2004-2005 Beaches & Shores Resource Center
Florida State University