|
|
Jupiter / Carlin Design Parameters |
| |
| Jupiter / Carlin Shore Protection |
|---|
| County | Palm Beach | | Location | R-13.5 to R-19 | | Designer / Monitor | CP&E / CP&E, ATM, Taylor | | Construction Date | March - April 1995 | | Length (miles) | 1.14 | | Construction Beach Width (Avg. ft.) | 185 | | Design Volume (cy) | | | Volume Placed (cy) | 603,800 | | Volume Density (Avg. cy/ft) | 101 | | Construction Berm Width (Avg. ft.) | 175 | | Construction Berm Elevation (Avg. ft.) | 10 | | Borrow Source | Ebb Tidal Shoal | | Mean Grain Size (mm) | Native - 0.34, Ebb Shoal - 0.12 | | Longshore Transport Rate (cy/year) | | | Wave Direction (degree north) | | | Wave Height (feet) | | | Wave Period (sec.) | |
| | | | References: ATM(1998) CP&E(1995) |
|