| Jupiter / Carlin Shore Protection First Renourishment |
|---|
| County | Palm Beach |
| Location | R-13 to R-19 |
| Designer / Monitor | CP&E / ATM |
| Construction Date | December 2001 - March 2002 |
| Length (miles) | 1.14 |
| Construction Beach Width (Avg. ft.) | 147 |
| Design Volume (cy) | |
| Volume Placed (cy) | 625,000 |
| Volume Density (Avg. cy/ft) | 104 |
| Construction Berm Width (Avg. ft.) | 163 |
| Construction Berm Elevation (Avg. ft.) | 10 |
| Borrow Source | about 2 miles NE of Jupiter Inlet |
| Mean Grain Size (mm) | Borrow Area - 0.38 |
| Longshore Transport Rate (cy/year) | |
| Wave Direction (degree north) | |
| Wave Height (feet) | |
| Wave Period (sec.) | |