| Marco Island Beach Restoration |
|---|
| County | Collier | | Location | North - M3 to 7, Central - R135 to 139, South - R143 to 148 | | Designer / Monitor | CEC | | Construction Date | Nov. 1990 - Feb. 1991 | | Length (miles) | 2.64 | | Construction Beach Width (Avg. ft.) | Central - 277, South - 237 | | Design Volume (cy) | 1,180,000 | | Volume Placed (cy) | 1,264,299 | | Volume Density (Avg. cy/ft) | 90 | | Construction Berm Width (Avg. ft.) | North - 80, Central - 210, South - 260 | | Borrow Source | North - Big Marco/Capri Pass, South -Caxambas Pass | | Mean Grain Size (mm) | North - 0.35, Central - 0.18, South - 0.20 | | Longshore Transport Rate (cy/year) | 46,180, N to S | | Wave Direction (degree north) | | | Wave Height (feet) | | | Wave Period (sec.) | |
|